What our customers & associates have to say

Stephen Griffin

On this project, CJK’s work has consistently been of a high quality and CJK have always made a proactive contribution to successfully integrate their element of the works

Stephen GriffinElectrical EngineerARUP
Stephen Toomey

I found CJK to be professional, cooperative, helpful and proactive over the course of the works. I would particularly note that they adopted a ‘can do’ attitude and I have, post completion of the works, sought to include them on our Approved Contractors List.

Stephen ToomeyBuilding Project Manager, Technical Services DeptBeaumont Hospital
Gerard McEvoy

CJK have completed all projects to the highest standard. Their personal attention to detail and speedy responses to all issues greatly enhanced the successful completion of the above projects. I would have no hesitation in recommending CJK as a competent and professional company who bring the extra benefit of practical knowledge and experience to their work.

Gerard McEvoyAssistant Estates OfficerDCU
Cian Moynihan

The CJK team on site were very cooperative and contributed to the successful completion of the project, on time and on budget. The standard of the installation was of the same high quality as we have become accustomed to on previous projects with CJK. CJK went to great lengths to ensure that both the client and design team requirements were met at all times.

Cian MoynihanElectrical Engineer Metec Consulting Engineers
Paul Bolger

I have found CJK to be a highly professional company. All works have been completed to the highest standards. All call outs and reactive tasks have been completed within the time frame required. Based on works to date I have no hesitation in recommending CJK for contracts of a similar nature.

Paul Bolger Engineering Services Co-OrdinatorTrinity College Dublin
Cormac Reynolds

All works have been completed to the highest standard. I found the CJK construction team to have a very hands on, flexible and professional approach when dealing with the client and building / campus users.

Cormac ReynoldsElectrical Services Manager & project engineerUCD Buildings & Services
Eoin Daly

CJK Engineering has successfully completed the Temporary Electrical project for McAvoy Group on the Amgen Pharmaceutical site, Pottery Road, Dun Laoghaire. The project was for the temporary office set up on Project Hawk, and included the Electrical services that comprised Lighting, Distribution Boards, General Power, Voice & Data, Fire Alarm, Mechanical wiring and all relevant testing and commissioning.

All CJK work was completed to the highest standard, the project management and staff were professional and flexible and always went about their work safely and to the highest quality standards. McAvoy Group has a long standing relationship with CJK and has subsequently started another project with them on the Intel campus in Leixlip where safety, quality and attention to detail are paramount. I would have no hesitation in recommending CJK Engineering for any electrical project and have always found them a pleasure to deal with. Should you require any further information please do not hesitate to contact the undersigned.

Eoin DalySales DirectorMcAvoy Group Ltd
Joseph Toolan

CJK Engineering was contracted by EGIS to supply and install the car park / mast lighting system at the Dublin Tunnel Control Building.

CJK were responsible for the supply, installation and commissioning of the complete floodlighting scheme. They also co-ordinated specialist’s contractors during the project and acted as Project Supervisor Construction Stage (PSCS) in accordance with current Health and Safety Regulations.

CJK Engineering Ltd completed the project during the summer of 2014 to a high standard and within the desired programme.

We were extremely satisfied with the high level of service and excellent workmanship demonstrated throughout the project and would have no hesitation in recommending CJK Engineering for projects of a similar nature in the future.

If you require further information or clarification on the above please do not hesitate to contact the undersigned.

Joseph ToolanProjects DepartmentEgis Road & Tunnel Operation Ireland
Jason Flannery

CJK Electrical have worked with us on office fit projects in IBM / Damastown and Fidelity / Citywest/

They were responsible for the installation of the electrical systems on both projects. At all times we found CJK Electrical approachable throughout all stages of the project and very pro-active in dealing with issues as they arose.

They co-operated and integrated seamlessly with our demanding schedule of works. Throughout the projects we found the quality of their workmanship to be of a high standard. They have always been flexible in their approach and their staff have always acted in a professional and competent manner.
I would have no hesitation in recommending CJK Electrical for future projects

Jason FlanneryDirector of EngineeringMac Interiors
Mike Dermody

MTD Project Management Ltd were appointed to assist Virtus Contract Management Ltd in project managing the installation of new and upgrading existing fire alarm systems in the 299 apartments at Longboat Quay. MTD’s involvement commenced after the signing of contracts between Longboat and CJK Engineering and the role was to ensure installation and certification in compliance with the contracted requirements and to monitor and manage the works in the occupied units.

We can confirm that the complete works were installed by CJK Engineering and their approach from the beginning to the end was professional, considerate and punctual. Their standard of works was such that snagging etc, if applicable was completed at the time of installation without re-visit and the nature of snagging was minimal. The punctuality with which the works were managed was precise and caused no issues with the residents in occupancy.

The completion and commissioning was also well managed and letters of appreciation were received from some of the residents in occupancy. I would have no hesitation in recommending CJK Engineering to any perspective Client and look forward to engaging them on future projects as they can be relied upon in all aspects of their works.

Mike DermodyDirectorMTD Group
Bernie McNally

CJK Engineering were commissioned in July 2013 to upgrade an electrical cable at the factory of OpenHydro. The CJK team proved themselves to be very courteous and professional for the duration of the project, from the initial phone call to their office to the completion of the works.

The CJK Engineering team carried out the electrical upgrade work out of hours, in order to avoid disruption to the office.

This project was completed on time and within budget. I would have no hesitation in considering CJK Engineering for any future electrical projects.

Bernie McNallyOffice ManagerOpen Hydro
Michael Smithwick

IN2 wish to confirm that CJK completed the Electrical Installation for the fit out of Hannover Re office in Custom House Plaza in the IFSC, Dublin 1, to a value of €235,575.

CJK undertook the project in a professional and flexible manner and took a proactive role in the ensuring the project was completed to the satisfaction of all.

We are entirely satisfied with the service provided by CJK and we have no hesitation in recommending them for work in the future.

Michael SmithwickSenior Electrical Project EngineerIN2 Engineering Design Partnership