We lifted two 1MW energy efficient chillers using a 450T mobile crane on our Dublin Airport project.
The team ensured that the existing mission critical cooling system remained online while the new system was installed and connected. A large traffic management plan was in place overnight to allow us to close the departures road and manage the associated diversion of traffic.
The daa will achieve a 42% reduction in annual energy saving costs and a 26% reduction in refrigerant needed to operate the chillers as well as an ODP of 0 and a GWP of 1430.
Thank you to Kavanagh Crane Hire Ltd and all the team for a safe and efficient lift. To watch the full video head to our LinkedIn: Click Here.